1986 • Approximately 70 FT Hatteras • Twin Detroit Diesel 12V71TI Marine Diesel Engines
Professional Marine Engine Survey
Survey Conducted By:
Jeff Lendall & Sons
805 Marine Diesel Mechanic
This survey documents visual inspection, operational testing, sea trial performance, turbocharger condition, Twin Disc MG-514C marine-gear findings, laboratory oil analysis, propulsion drivetrain observations, cooling-system condition, generator observations, bow-thruster findings, and estimated repair requirements aboard M/V Lady T.
Detroit Diesel 12V71TI
Twin Disc MG-514C
Sea Trial
Oil Analysis
Cooling System Review
Executive Survey Summary
As a result of my investigation, marine engine survey, visual inspection, operational testing, cooling-system pressure testing, laboratory oil analysis, and sea trial, my opinion is that the overall machinery rating is GOOD — WITH SIGNIFICANT REPAIRS RECOMMENDED.
The engine room and Detroit Diesel engines appear generally clean and well maintained. The primary repair concerns are centered around the four turbochargers, both Twin Disc MG-514C marine gears, propulsion shaft/cutlass-bearing condition, and seawater pumps.
GOOD
FAILED — Water in Both Gears
Marine Gears, Turbos, Drivetrain & Seawater Pumps
Laboratory oil analysis identified water contamination in both Twin Disc MG-514C marine gears. Both oil samples failed laboratory analysis. Both marine gears also produced a noticeable clunk during reverse engagement. Both should be professionally evaluated internally and the source of water contamination identified.
During WOT testing, significant black exhaust smoke was observed. Subsequent inspection identified oil leakage associated with turbocharger seal areas entering the exhaust system. Replacement of all four turbochargers is recommended.
System Condition Matrix
| System | Condition |
|---|---|
| Fuel System | Excellent |
| Main Engine Lubrication System | Excellent |
| Cooling System | Operating satisfactorily; seawater pumps require replacement due to seal leakage |
| Turbocharger System | Replacement Recommended |
| Port Twin Disc MG-514C Marine Gear | FAILED OIL ANALYSIS — water contamination |
| Starboard Twin Disc MG-514C Marine Gear | FAILED OIL ANALYSIS — water contamination |
| Marine Gear Reverse Engagement | Abnormal clunk — internal inspection recommended |
| Shaft / Cutlass-Bearing Area | Movement observed — further inspection required |
| Steering & Rudders | Very Good |
| Northern Lights Generator | Operational — seawater pump leaking at seal |
| Bow Thruster | Operational — zinc and bearing service required |
Vessel & Engine Identification
| Vessel | M/V LADY T |
|---|---|
| Builder | Hatteras |
| Year | 1986 |
| Length | Approximately 70 FT |
PORT DETROIT DIESEL
Model: 12V71TI
Engine Type: Inboard Diesel
Rated Power: 650 HP
Engine Hours: 4,670
Marine Gear: Twin Disc MG-514C
Gear Oil Analysis: FAILED — Water Contamination
STARBOARD DETROIT DIESEL
Model: 12V71TI
Engine Type: Inboard Diesel
Rated Power: 650 HP
Engine Hours: 4,040
Marine Gear: Twin Disc MG-514C
Gear Oil Analysis: FAILED — Water Contamination
Model: PX-320K2
Serial Number: K64553
Recorded Hours: 287
Rated Output: 20 kW
Detroit Diesel 12V71TI Operational Findings
Engine synchronization appeared normal with no excessive load imbalance observed.
Both engines started promptly without excessive crank time or abnormal smoke.
Engine coolant temperatures remained within normal operating range during cruise and WOT testing.
Approximately 60 PSI port and 60 PSI starboard during WOT testing.
Both engines reached approximately 2100 RPM.
Oil leakage was observed from turbocharger seal areas with evidence of oil entering the exhaust system. Significant black exhaust smoke was evident at WOT. Replacement of all four turbochargers is recommended.
Both gears operated smoothly in forward, but a noticeable clunk was heard and felt during reverse engagement. Both gears failed oil analysis due to water contamination. Internal inspection and determination of the water-entry source are recommended.
Visual Engine Inspection Findings
Racor Twin Turbine Series 900 assemblies were inspected. No water was observed and the assemblies appeared serviceable.
Both Twin Disc MG-514C gears exhibited reverse-engagement clunking and failed laboratory oil analysis due to water contamination.
Leakage was observed at the seal/weep-hole areas on both Detroit Diesel seawater pumps and the Northern Lights generator seawater pump. Replacement of all three is recommended.
Performance appeared satisfactory and coolant temperatures remained normal.
Inlet and outlet temperatures appeared within expected operating parameters.
Both main engines and the generator were tested to approximately 25 PSI. All three systems passed.
Generally serviceable where visible, with double-clamped hose connections.
Movement was observed. Further inspection of bearing wear, shaft condition, couplings, and alignment is recommended.
Operated satisfactorily during docking; shaft play was observed during haul-out. Bearing replacement and zinc service are recommended.
Sea Trial Report
| Sea Trial Item | Observation |
|---|---|
| Cold Start | Both engines started promptly without excessive cranking or abnormal smoke. |
| WOT Engine Speed | Approximately 2100 RPM on both engines. |
| Exhaust Appearance | Significant black smoke at WOT; turbocharger oil leakage observed. |
| Cooling Water Discharge | Strong and consistent from both main engines and generator. |
| Coolant Temperature | Within normal limits during cruise and WOT. |
| Oil Pressure | Approximately 60 PSI on both engines under full load. |
| Marine Gear Forward Operation | Both gears operated smoothly in forward. |
| Marine Gear Reverse Operation | Noticeable clunk in both gears. |
| Marine Gear Oil Analysis | Both gears FAILED due to water contamination. |
| Bow Thruster | Operational during docking; shaft play observed during haul-out. |
Reverse-engagement clunking combined with confirmed water contamination in both Twin Disc MG-514C gears warrants internal inspection of both units.
Laboratory Oil Analysis Reports
The following five laboratory samples are included in the survey record. Both marine gears failed due to water contamination. Reports for the main engines and generator are linked below without assigning additional laboratory findings.
| Component | Finding | Laboratory Report |
|---|---|---|
| Starboard Twin Disc MG-514C | FAILED — WATER CONTAMINATION |
VIEW STARBOARD GEAR REPORT |
| Port Twin Disc MG-514C | FAILED — WATER CONTAMINATION |
VIEW PORT GEAR REPORT |
| Detroit Diesel Starboard Engine | Sample obtained |
VIEW STARBOARD ENGINE REPORT |
| Detroit Diesel Port Engine | Sample obtained |
VIEW PORT ENGINE REPORT |
| Northern Lights Generator | Sample obtained |
VIEW GENERATOR REPORT |
Water contamination was detected in both Twin Disc MG-514C marine gears. Inspection should include oil coolers, cooling-water interfaces, seals, breathers, bearings, clutch components, gears, shafts, and internal surfaces as appropriate during disassembly.
Detroit Diesel 12V71TI Marine Engine Survey Summary
As a result of my investigation, marine engine survey, laboratory oil analysis, operational testing, cooling-system pressure testing, and by virtue of my experience, my opinion is OVERALL MACHINERY RATING: GOOD — WITH SIGNIFICANT REPAIRS RECOMMENDED. The engine room and main engines appear generally clean and well maintained.
The Detroit Diesel 12V71TI engines showed favorable cold starting, strong oil pressure under load, normal coolant-temperature performance, acceptable synchronization, and the ability to reach approximately 2100 RPM during WOT testing.
The primary mechanical concerns are the four turbochargers and both Twin Disc MG-514C marine gears. Significant black exhaust smoke and turbocharger oil leakage were observed during WOT testing. Both marine gears produced a noticeable clunk during reverse engagement and subsequently failed laboratory oil analysis because water was detected in both gear-oil samples.
Additional service findings include propulsion shaft/cutlass-bearing movement, leaking seawater-pump seals on both Detroit Diesel engines and the Northern Lights generator, exhaust-manifold gasket service, sea-strainer maintenance, and bow-thruster bearing and zinc service.
Engine room clean and tidy, generally well maintained.
Sea Trial Video — Wide-Open-Throttle Test
Both Detroit Diesel 12V71TI engines reached approximately 2100 RPM during the wide-open-throttle test.
During the initial WOT test, significant black exhaust smoke raised concern regarding turbocharger and exhaust condition. Further observation from the engine room and subsequent inspection identified oil leakage associated with turbocharger seals entering the exhaust system.
Turbocharger Oil Leakage — Port and Starboard Engines
Oil was observed entering the exhaust-manifold area from a turbocharger on each engine. Based on the overall condition and WOT exhaust behavior, replacement of all four turbochargers is recommended.
Turbocharger Inspection — Video 1
Turbocharger Inspection — Video 2
Seawater pump showing evidence of seal leakage. Both Detroit Diesel main-engine seawater pumps require replacement.
Replace both Detroit Diesel seawater pumps and the leaking Northern Lights generator seawater pump.
Movement observed between the propulsion shaft and cutlass-bearing area. Further drivetrain inspection is recommended.
Determine bearing wear, shaft condition, coupling condition, and driveline alignment before establishing a final repair allowance.
Recommendations & Ballpark Estimate to Repair Mechanical Issues
Repair the major marine-gear, drivetrain, turbocharger, cooling-system, exhaust, and seawater-system deficiencies identified during this survey.
These figures are preliminary budgetary allowances and are not fixed-price quotations.
| Recommended Repair / Service | Ballpark Estimate |
|---|---|
|
Twin Disc MG-514C Marine Gears
Remove, professionally rebuild, and reinstall both existing marine gears. Determine the source of water contamination; inspect marine-gear oil coolers and associated cooling-water interfaces; reconnect associated systems; check alignment; dock test and sea trial. |
$53,000–$67,000 |
|
Replace Four Detroit Diesel Turbochargers
Replace all four turbochargers, including removal, installation, associated gaskets, seals, hoses, clamps, and operational testing. |
$22,000 |
|
Port Detroit Diesel Seawater Pump
Replacement pump $1,465 plus approximately 3 hours labor. |
Included Below |
|
Starboard Detroit Diesel Seawater Pump
Replacement pump $1,465 plus approximately 3 hours labor. |
Included Below |
|
Northern Lights Generator Seawater Pump
Replacement pump $720 plus approximately 2 hours labor. |
Included Below |
|
Four Exhaust Manifold Gaskets
Replace all four gaskets and inspect sealing surfaces and associated hardware. |
$558 Parts + 8 Hours Labor |
|
Sea Strainer Maintenance
Disassemble, clean, inspect, service, and reassemble applicable main-engine and generator seawater strainers. |
6 Hours Labor + Materials |
Additional Parts & Labor Breakdown
| Additional Parts / Labor Item | Cost |
|---|---|
| Detroit Diesel seawater pumps — $1,465 × 2 | $2,930 |
| Northern Lights generator seawater pump | $720 |
| Four exhaust manifold gaskets | $558 |
| Labor — 22 hours × $175/hr | $3,850 |
| Sea-strainer seals, O-rings, gaskets, hoses, clamps, and miscellaneous materials | As Required |
| Known Additional Parts & Labor Subtotal | $8,058 + Materials |
OPTION 1 — Marine Gear Rebuild & Turbocharger Replacement
Rebuild Both Twin Disc MG-514C Marine Gears:
$53,000–$67,000
Replace All Four Turbochargers:
$22,000
Additional Identified Maintenance:
$8,058 + materials
ESTIMATED TOTAL: $83,058–$97,058
Plus additional materials and excluded repairs.
Marine Gear Replacement Alternative
As an alternative to rebuilding the existing Twin Disc MG-514C marine gears, replacement with rebuilt/remanufactured units may be considered.
A budgeting reference of approximately $32,224.50 per marine gear represents approximately $64,449 for two units, before removal, installation, freight, core handling, fluids, alignment, associated repairs, and testing.
Estimated complete two-marine-gear replacement project: $85,000–$105,000.
Four Turbocharger Replacement Allowance
Replacement of all four Detroit Diesel marine turbochargers is budgeted at a straight $22,000.
This allowance is used consistently in both repair options and includes the specified replacement work. The previous turbocharger rebuild and replacement price ranges have been removed from the combined budgets.
Total Turbocharger Replacement Allowance: $22,000.
OPTION 2 — Marine Gear Replacement & Turbocharger Replacement
Replace Both Twin Disc MG-514C Marine Gears:
$85,000–$105,000
Replace All Four Turbochargers:
$22,000
Additional Identified Maintenance:
$8,058 + materials
ESTIMATED TOTAL: $115,058–$135,058
Plus additional materials and excluded repairs.
These repair-cost figures are preliminary survey budgeting allowances.
The extent of internal water-related marine-gear damage cannot be established until the gears are removed and inspected. Major hard-part damage, marine-gear cooler failure, shaft or coupling repairs, alignment corrections, yard charges, freight, core issues, structural access requirements, or additional deficiencies may increase final repair costs.
Priority Recommendations
Both gears failed laboratory oil analysis due to water contamination and both exhibited abnormal reverse engagement. Determine the water-entry source and internally inspect both marine gears.
Replace all four turbochargers due to oil leakage and significant black exhaust smoke during WOT operation. Estimated replacement allowance: $22,000.
Replace both Detroit Diesel main-engine seawater pumps and the Northern Lights generator seawater pump.
Determine actual bearing wear, shaft condition, coupling condition, and driveline alignment.
Replace the four identified exhaust-manifold gaskets and inspect sealing surfaces and hardware.
Disassemble, clean, inspect, service, and reassemble applicable main-engine and generator seawater strainers.
Inspect and replace bearing components as required and replace the zinc anode.
Items Requiring Additional Inspection
The failed laboratory samples establish water contamination in both marine gears but do not establish the complete extent of internal damage. Bearings, gears, clutch components, shafts, seals, oil coolers, lubricant passages, and internal surfaces should be inspected during removal/disassembly.
Movement was observed in the propulsion shaft/cutlass-bearing area. Bearing wear, shaft condition, coupling condition, and driveline alignment should be determined during further inspection.
The bow thruster operated during docking; however, shaft play was identified during haul-out inspection. Bearing replacement is recommended.
Zinc-anode service is recommended while the bow thruster is being serviced.
Shaft, cutlass-bearing, coupling, propeller, bow-thruster bearing, unforeseen marine-gear hard-part damage, marine-gear cooler repairs, and other unidentified repairs are not included in the combined estimates because the complete repair scope has not yet been established.
Final Surveyor Conclusion
Based on visual inspection findings, operational testing, cooling-system pressure testing, laboratory oil analysis, machinery observations, and sea-trial performance, the twin Detroit Diesel 12V71TI engines aboard M/V Lady T demonstrated several favorable basic operating characteristics.
Both engines started promptly from cold, maintained approximately 60 PSI oil pressure during WOT operation, maintained coolant temperatures within normal operating limits, and reached approximately 2100 RPM during wide-open-throttle testing.
The engine room and main engines were generally clean and appeared well maintained.
The principal mechanical concerns are the condition of the four turbochargers, the failed oil-analysis results for both Twin Disc MG-514C marine gears due to water contamination, the reverse-engagement clunk observed in both gears, propulsion shaft/cutlass-bearing movement, seawater-pump leakage on both Detroit Diesel engines and the Northern Lights generator, exhaust-manifold gasket service, sea-strainer maintenance, and bow-thruster bearing wear.
Both Twin Disc MG-514C marine gears failed laboratory oil analysis because water was detected in the lubricant. Combined with the abnormal reverse-engagement clunk, this represents a significant drivetrain concern. Both marine gears should be internally evaluated before they can be considered acceptable for continued service.
Turbocharger oil leakage and significant black exhaust smoke observed during WOT testing indicate that all four turbochargers require replacement. The estimated replacement allowance for all four units is $22,000.
The clunking condition heard and felt when both Twin Disc MG-514C marine gears were shifted into reverse, together with movement observed in the shaft/cutlass-bearing area and the failed marine-gear oil-analysis results, requires additional investigation before the drivetrain can be considered fully serviceable.
Final Machinery Assessment
Overall Machinery Condition:
GOOD — WITH SIGNIFICANT REPAIRS RECOMMENDED
OPTION 1 — Marine Gear Rebuilds + Four Turbocharger Replacements:
$83,058–$97,058
OPTION 2 — Marine Gear Replacements + Four Turbocharger Replacements:
$115,058–$135,058
Both options exclude additional materials and repairs not yet fully defined.
Professional Survey Notes
NOTICE:
The following statements limit the liability of the undersigned and set ethical standards associated with this report. Use of this report for any purpose constitutes acceptance of the following:
NOTE A: This report is issued without prejudice and is the property of the Requestor as listed above. Any use or distribution by another party is prohibited and shall render this report invalid.
NOTE B: This report is issued subject to the understanding that the undersigned surveyor is not responsible for error, omission, negligence, or misstatement. This report is a statement of my opinion based on the conditions as I found them. It is not a warranty, express or implied.
NOTE C: This survey represents conditions observed during inspection and sea trial. Components that were concealed, inaccessible, internally damaged, or not reasonably inspectable without disassembly may contain conditions that were not visible at the time of inspection.
NOTE D: Repair estimates contained in this report are provided for general budgeting purposes and may change following component disassembly, additional inspection, parts research, laboratory findings, or discovery of additional deficiencies.
Survey Conducted By
Owner / Surveyor: Jeff Lendall
Jeff Lendall & Sons
805 Marine Diesel Mechanic
Professional Marine Diesel Engine Diagnostics, Surveys, Maintenance and Repair